On Tuesday the client's architect walked the second floor and asked for the partition in office 2.04 to move 600mm to the left. The site manager said fine, the joiners moved it on Wednesday, and nobody wrote anything down. Six months later, at the final account, that's one of forty-odd changes the client says they never agreed to pay for.
Every project has these. A change of finish, an extra socket, a door widened, a delay because the drawings came late. On their own they're small. Together they're the margin on the job, and they're only recoverable if each one was recorded, priced and approved at the time.
A variation request form doesn't make the changes go away. It makes sure each one leaves a paper trail before the work starts, not after.
What a variation request needs
Whatever you build it with, a construction variation request should capture the change while everyone still remembers it. It needs:
- Which project. Picked from a list, so every variation sits against the right job and the right contract.
- Who instructed it, and when. The client, the architect, the engineer, or your own team. Name, role and date. This is the field that decides whether the change is chargeable.
- How it was instructed. Verbally on site, by email, on a revised drawing, in a site meeting. A verbal instruction needs confirming in writing, so record it.
- What's changing. A plain description and the location: "Move partition between 2.04 and 2.05 600mm west, as marked on site."
- Drawings, photos or the email. Attach the marked-up drawing or the instruction itself.
- The price. Labour, materials, plant and any subcontractor cost, with a total. A rough estimate is fine at first, as long as it's there.
- The time impact. Days added to the programme, if any. Time gets argued about as much as money.
- Who's raising it. The site manager or QS filling in the form.
The most important field is the first one people skip: who instructed it. A variation without an instruction is just extra work you did for free.
Approval before the work, not after
The obvious fix, a variation register in Excel filled in at the end of the month, records changes after they've happened. By then the price is a guess and the instruction is a memory.
The order should be: record it, price it, approve it, then do it. For urgent changes that can't wait, record it and start, but mark it as proceeding at risk so everyone can see which variations haven't been agreed yet.
Who approves depends on the value. Small changes can be signed off by the project manager on the day. Larger ones need the commercial manager or a director, because they affect the contract sum. Agree the bands once and write them into the form's help text, so site teams know what happens to a variation before they submit it.
How to build it in stepbase
There's no ready-made template for variations, but it's one Table, one Form and a short Workflow. You can also describe it on the stepbase home page ("variation requests: project manager approves; over 5,000 the commercial manager approves too") and let it draft the app, then check it against these steps.
- Make a Projects Table. One row per job, with the project name, contract reference, the project manager's email and the commercial manager's email. The Form picks from this Table, and the Workflow uses it to decide who approves.
- Build the Variation Request Form. Add Project as a choice from the Projects Table, then Instructed by, Instructed by (role) (Client, Architect, Engineer, Own team), Date instructed, How instructed (Verbal, Email, Drawing, Site meeting), Description, Location, Attachments, Estimated cost, Time impact (days) and Proceeding at risk? (yes or no).
- Break the cost down. To list labour, materials, plant and subcontract costs line by line, use a table field with a row per cost line. Keep a separate Estimated cost total field for the Rule to read.
- Ask for confirmation only when it's needed. Use conditional logic so that when How instructed is Verbal, the form asks Has this been confirmed in writing? and asks for the confirmation to be attached once it has.
- Add the project manager's Step. Every variation goes first to a review Step for the project manager, assigned by Table Lookup: the project picked on the form finds its row in the Projects Table, and that row's project manager email gets the Task. Give it the Actions Approve, Reject and Needs re-pricing.
- Add a Rule on the value. After the project manager approves, a Rule checks the estimated cost. Under your limit, the variation goes straight to an Approved Outcome. At or above it, it goes to a second review Step for the commercial manager, found the same way from the Projects Table.
- Give each ending a status. Use Outcomes for Approved, Rejected and Needs re-pricing, so the site manager can see where each variation stands without phoning anyone.
- Set a deadline on both Steps. If a variation is waiting more than two days, hand the Task to a second approver. Waiting for approval is how a "small change" ends up built and unpaid.
Every variation lands as a row in the Form's Table, against its project. Put a Page in front of the commercial team with the open variations per project and the total value approved, pending and at risk. That's the number they need for the monthly valuation.
Making it fit your projects
- Different limits per project. A £5,000 variation means something different on a £200,000 fit-out and a £20m new build. Add an approval limit column to the Projects Table and have the Rule compare against it, instead of one number for every job.
- Proceeding at risk. Add a Board view of the variations Table grouped by status, with a saved view of everything marked proceeding at risk. That's the list to clear before the next valuation.
- Number them per project. Each Submission gets its own number automatically, and you can add a column for the variation number in your contract's format.
- Keep the history with the variation. Who raised it, who approved it and when, and any notes, are all in the variation's history. At the final account that history is your evidence.
Start with one live project
Pick the project with the most changes coming through and run every variation through the Form for a month, including the ones already agreed verbally. The first thing most teams notice is how many changes had no written instruction. Once the commercial manager has seen a month of variations in one Table instead of in emails, rolling it out to the next project is easy: add a row to the Projects Table.
Describe your variation process at stepbase, and build it with your own approval bands and your own words.